| Project
|
Description |
|
|
|
PETROBEL Temsah Nw Platform
|
Quantitative Risk Assessment for the preparation of a Safety Contingency Plan. |
|
|
|
PETROBEL Barboni Platform
|
Cost Benefit Analysis for the installation of Safety Valves (SSIV) on gas exportation sealines. |
|
|
|
ENI CONGO Loango, Zatchi, and Kitina Fields
|
Quantitative Risk Assessment and F&G and adequacy verification of the firefighting systems (Loango DP1-PP, Zatchi ZAF3-ZAP, and Kitina eplatforms). |
|
|
|
ENI CONGO Kitina Field
|
Relevant incidental scenarios Assessment of the upper deck (gas compressors vs. Living Quarter). |
|
|
|
NAOC Obiafu-Obrikom Gas Plant
|
Quantitative Risk Assessment (QRA) and firefighting systems adequacy verification. |
|
|
|
NAOC Ebocha Oil Centre
|
Quantitative Risk Assessment (QRA) and requirements definition for the explosion resistance of the new Control Room. |
|
|
|
KPO Karachaganak 4th Stabilization 6 Sweetening Train
|
Risk level Assessment (PLL, IRPA and Group Risk) of the 4th Train construction works and the safety distance from the existing KPC complex. |
|
|
|
KPO Karachaganak Phase III
|
HSE support to the verification of basic and detailed design activities implemented by the Contractor “Petrofac”. |
|
|
|
|
SGA/SGS
|
Assistance and follow-up for the ISO 14001 and OHSAS 18001 certificates of Environmental Management System and Safety Management System of various Clients. |
|
|
|
|
QUALITY SYSTEM DEVELOPMENT |
Assistance in the definition, development, and implementation of a Company quality system.
|
|
|
|
|
SGI HSEQ-R |
Assistance for the development and updating of an integrated Health, Safety, Environment, Quality, and Radiation Protection management system of various Clients. |
|
|
|